Easy to install on a thoroughly dewaxed and degreased board.
For good adhesion, the installation temperature should be above 20°C.
Slightly heat the application area by rubbing vigorously with the palm of the hand.
Press down and hold the pad in place for a few hours using a clamp or tape.
Wait 24 hours before entering the water.
You can re-affix the pad with neoprene glue or flexible polyurethane glue.